H/A Collection NCE Construction Book 3

A continuation of Book Two
Showing progress of construction on Keddie-Bieber line of Western Pacific Railroad. Pictures taken during the first week in December, 1930, are in Books, 2 and 3.
Miles shown in description are construction sections and are approximate only.
In describing accompanying photographs the words "north" and "south" are used in the railroad sense only without respect to points of the compass. "North" is toward Bieber; "south" is toward Keddie.

NCE_Book_3_Page_01_12-01-1930_Negative_245_thumbnail.jpg
Mile 26 Wolf Creek Summit. Looking north from junction of south leg of wye, Wolf Creek Station grounds.
12-01-1930
NCE_Book_3_Page_02_12-01-1930_Negative_243_thumbnail.jpg
Mile 26 Wolf Creek Summit. Showing grading at Wolf Creek station grounds. It is interesting to note that in a four day trip over all of the construction activities on this line, the 12 horses shown in this view, and one mule on a tunnel job, represented the only animal power being used.
12-01-1930
NCE_Book_3_Page_03_12-01-1930_Negative_242_thumbnail.jpg
Mile 26 Wolf Creek Summit. Looking north of grade near Wolf Creek Summit, Lake Almanor to the left.
12-01-1930
NCE_Book_3_Page_04_12-01-1930_Negative_244_thumbnail.jpg
Mile 26 Wolf Creek Summit. View looking west from grade of new line, showing Mount Lassen and Lake Almanor.
12-01-1930
NCE_Book_3_Page_05_12-01-1930_Negative_241_thumbnail.jpg
Mile 27 Near Wolf Creek Summit. Looking north along practically completed grade.
12-01-1930
NCE_Book_3_Page_06_12-01-1930_Negative_240_thumbnail.jpg
Mile 27 Near Wolf Creek Summit. Looking north along nearly completed grade. The grade at the left is that of a highway change being built by the railroad to avoid two highway crossings.
12-01-1930
NCE_Book_3_Page_07_12-01-1930_Negative_277_thumbnail.jpg
Construction engineers office staff in front of construction headquarters at Westwood.
12-01-1930
NCE_Book_3_Page_08_12-01-1930_Negative_278_thumbnail.jpg
Construction engineers headquarters at Westwood.
12-01-1930
NCE_Book_3_Page_10_12-01-1930_Negative_282_thumbnail.jpg
Mile 61 Bogard. View looking south along completed grade as built by the dragline excavator described in the previous picture.
12-01-1930
NCE_Book_3_Page_11_12-01-1930_Negative_308_thumbnail.jpg
Mile 73 Between Poison Lake and Jelly Camp. Looking south showing right of way clearing.
12-01-1930
NCE_Book_3_Page_12_12-01-1930_Negative_307_thumbnail.jpg
Mile 73 Between Poison Lake and Jelly Camp. Looking north.
12-01-1930
NCE_Book_3_Page_14_12-01-1930_Negative_288_thumbnail.jpg
Mile 76 Between Poison Lake and Jelly Camp. Looking north
12-01-1930
NCE_Book_3_Page_15_12-01-1930_Negative_290_thumbnail.jpg
Mile 81 Between Jelly Camp and Beaver Creek. View looking south along practically completed grade.
12-01-1930
NCE_Book_3_Page_16_12-01-1930_Negative_289_thumbnail.jpg
Mile 81 Between Jelly Camp and Beaver Creek. View looking south along practically completed grade.
12-01-1930
NCE_Book_3_Page_17_12-01-1930_Negative_291_thumbnail.jpg
Mile 82 Between Jelly Camp and Beaver Creek. Looking south along partially completed grade.
12-01-1930
NCE_Book_3_Page_18_12-01-1930_Negative_293_thumbnail.jpg
Mile 88 Beaver Creek. Looking north and down to twin 72 corrugated culverts which will carry Beaver Creek under the 100 foot fill across to gulch. Note figure on culvert to get idea of the scale. Compare with page 24 Book 1.
12-01-1930
NCE_Book_3_Page_19_12-01-1930_Negative_292_thumbnail.jpg
Mile 88 Beaver Creek. Looking down Beaver Creek showing twin 72 culverts under the final 100 foot fill. Compare with page 24 Book 1.
12-01-1930
NCE_Book_3_Page_20_12-01-1930_Negative_279_thumbnail.jpg
Mile 97 Near Horse Creek. Looking south along nearly completed grade.
12-01-1930
NCE_Book_3_Page_21_12-01-1930_Negative_280_thumbnail.jpg
Mile 97 Near Horse Creek. Looking north along practically completed grade.
12-01-1930
NCE_Book_3_Page_22_12-01-1930_Negative_286_thumbnail.jpg
Mile 100 Between Bognuda and Clark Valley Summit. Looking south along grade.Compare with page 30 Book 1.
12-01-1930
NCE_Book_3_Page_23_12-01-1930_Negative_285_thumbnail.jpg
Mile 101 Near Clark Valley Summit. Looking south along practically completed grade in lava formation.
12-01-1930
NCE_Book_3_Page_24_12-01-1930_Negative_302_thumbnail.jpg
Mile 101 Near Clark Valley Summit. Power shovel in lava rock cut after blasting.
12-01-1930
NCE_Book_3_Page_25_12-01-1930_Negative_303_thumbnail.jpg
Mile 104 Near Clark Valley Summit. Looking south at north portal tunnel 11. Preliminary work up to portal face.
12-1-1930
NCE_Book_3_Page_28_12-01-1930_Negative_296_thumbnail.jpg
Mile 109 Near Pit River Crossing. Looking north approaching Pit River Crossing.
12-01-1930
NCE_Book_3_Page_29_12-01-1930_Negative_300_thumbnail.jpg
Mile 109 Pit River Crossing. Looking north showing site of Pit River Crossing. Note practically completed grade at and left. Portion of contractors camp on south bank. From Sandy Point
12-01-1930
NCE_Book_3_Page_30_12-01-1930_Negative_301_thumbnail.jpg
Mile 110 North of Pit River Crossing. Looking south along grade. Pit River to the left. Compare with page 34 Book 1.
12-01-1930
NCE_Book_3_Page_31_12-01-1930_Negative_295_thumbnail.jpg
Mile 110 North of Pit River Crossing. Looking north along grade. Town of Bieber in distance. Compare with page 35 Book 1.
12-01-1930
NCE_Book_3_Page_32_12-01-1930_Negative_294_thumbnail.jpg
Mile 110 North of Pit River Crossing. Looking north along grade ready for main line and siding. Compare with page 36 Book 1.
12-01-1930
NCE_Book_3_Page_33_12-01-1930_Negative_304_thumbnail.jpg
Mile 112 End of Western Pacific line. Looking south along grade from junction point of IL P. RR. and G. N. Ry., main lines.Compare with page 38 Book 1.
12-01-1930
NCE_Book_3_Page_34_12-01-1930_Negative_305_thumbnail.jpg
Mile 112 End of Western Pacific Line. Looking north from junction of W. P. RR, and G.N.Ry., main lines and showing grade of Great Northern Railway. Bieber in distance. Compare with page 39 Book 1.
12-01-1930
NCE_Book_3_Page_35_12-01-1930_Negative_306_thumbnail.jpg
Mile 113 Bieber. Looking north showing grading for Bieber Terminal by Great Northern Railway.
12-01-1930

 

Desktop Home | Mobile Home | Shop Online | Contact | Subscribe | Privacy
 
Facebook   |   Instagram   |   YouTube

Operated by the Feather River Rail Society, a California 501(c)3 Non Profit Organization

700 Western Pacific Way, P.O. Box 608, Portola CA 96122-8636 | 1-530-832-4131 | email us at:   info@wplives.org

Copyright © 2024 Feather River Rail Society.  All Rights Reserved.  Page last updated:  Monday July 29, 2024 08:31 PDT