Page last updated: Thu Apr 21 19:33:19 PDT 2022
David Elems and Bil Jackson unbolting the stand from throw rod.
Track Work March 26, 2016
Bil and David unbolting the throw rod from the switch points.
Bil and David bolt the new throw rod onto the switch stand in it
David and Ethan Doty finish spiking the switch stand.
David and Greg Elems adjusting the distance between the points to make it perfect.
David using the air tamper to tamp the ties at the 2/3 switch.
Greg tamps while Steven Parry and Bil hold the tie up at the 3/4 switch with David ready to add more ballast if needed.
Page last updated: Thu Apr 21 19:33:19 PDT 2022