Logo

Track Work
March 26, 2016

- Ethan Doty


Page last updated:  Thu Apr 21 19:33:19 PDT 2022

Slide 1
David Elems and Bil Jackson unbolting the stand from throw rod.

Slide 2
Track Work March 26, 2016

Slide 3
Bil and David unbolting the throw rod from the switch points.

Slide 4
Bil and David bolt the new throw rod onto the switch stand in it

Slide 5
David and Ethan Doty finish spiking the switch stand.

Slide 6
David and Greg Elems adjusting the distance between the points to make it perfect.

Slide 7
David using the air tamper to tamp the ties at the 2/3 switch.

Slide 8
Greg tamps while Steven Parry and Bil hold the tie up at the 3/4 switch with David ready to add more ballast if needed.


Page last updated:  Thu Apr 21 19:33:19 PDT 2022