An August Morning Replacing Ties On The Balloon Track In 2017
Photos by - Jason Peterich


Click on an image to open the slide show,
or use the links to photographs below for large images of the

An August Morning Replacing Ties On The Balloon Track In 2017 gallery.

Page last updated:  Thu Apr 21 19:22:47 PDT 2022



View mobile friendly version of this web page HERE.


Links to photographs in slide show:

Image number 1 -- WP 917-D sits in idle while the MOW crew replaces ties.
Image number 2 -- The controls of WP 917-D.
Image number 3 -- The engineer's seat of WP 917-D.
Image number 4 -- Bil Jackson and Loren Ross take a quick rest while Greg Elems and Ethan Doty pull a new tie into place.
Image number 5 -- As progress is made, Loren and Ethan prepare to move the 917-D further down the tracks. The locomotive's air was being used to power the pneumatic spike driver.
Image number 6 -- Ethan climbs into the 917-D.
Image number 7 -- Greg, Loren, Bill, and Roger Stabler make sure the track is in gauge prior to spiking.
Image number 8 -- Greg and Bil adjust the tie's position.
Image number 9 -- Ethan stands in the shade of the pines, as temperatures were rather high that morning.
Image number 10 -- Bil, Loren, Ethan, and Roger use the track jack to gauge the rails.
Image number 11 -- After a long morning of work, Ethan brings the 917-D back over the pan.
Image number 12 -- Later that afternoon, I brought out the speeder to check for anymore ties in need of replacement.
Image number 13 -- WP 917-D after a morning of MOW work.
Image number 14 -- SN 712 and WP 917-D bask in the morning sunlight.